The Pool Building Process in Los Angeles: What Homeowners Need to Know

The Pool Building Process in Los Angeles: What Homeowners Need to Know

Dreaming of a backyard pool to beat the Southern California heat? If you’re in Los Angeles, building a pool isn’t just about design and aesthetics—it’s a multi-phase process that involves planning, permits, and plenty of patience. Here’s a step-by-step guide to the pool building process in LA, so you can dive into your project with clarity and confidence.

1. Initial Consultation & Design

The first step is meeting with a licensed pool contractor or landscape designer. In Los Angeles, pool design is often influenced by the unique terrain—whether it’s hillside, flat yard, or tight urban space. During this phase, you’ll discuss the pool’s shape, size, features (like spas, waterfalls, lighting), and how it integrates with your existing landscape.

Pro Tip: Many homeowners in LA opt for modern geometric pools or resort-style designs with Baja shelves and infinity edges to match the architectural vibe of the city.

2. Site Evaluation & Feasibility

Your contractor will assess your property to determine access for construction equipment, soil condition, and elevation changes. LA homes in hillside neighborhoods (like Hollywood Hills or Bel Air) may require retaining walls or reinforced foundations, adding complexity to the build.

3. Permitting Process

In Los Angeles, you must obtain permits from the Department of Building and Safety (LADBS). This includes:

  • Pool permit

  • Grading permit (if needed)

  • Electrical and plumbing permits

  • Inspections at various stages

Permitting can take 4–8 weeks or longer depending on your location, HOA rules, or if zoning variances are required. An experienced contractor will manage this process for you.

4. Excavation & Structural Build

Once permits are in hand, excavation begins. Heavy machinery digs the hole based on your design specs. Rebar is then installed to shape the pool’s frame, followed by plumbing, electrical, and shotcrete (a sprayed concrete that forms the shell).

Timeline: Excavation and structural work usually takes 1–3 weeks, depending on soil conditions and complexity.

5. Tile, Coping, and Decking

After the pool shell cures, finishing touches begin. Tile lines, pool coping (the edge around the pool), and surrounding decking (pavers, concrete, or stone) are installed. Many LA homeowners opt for luxury finishes like travertine or porcelain for a sleek, contemporary look.

6. Equipment Installation & Interior Finish

Next, the filtration system, pumps, and automation controls are installed—some LA homeowners even integrate their pool systems with smart home apps. The interior finish (plaster, pebble, or glass bead) is applied last, then the pool is filled.

7. Final Inspection & Pool School

Before swimming, the city performs a final inspection to ensure everything meets code. Your contractor will then walk you through “pool school,” teaching you how to maintain water chemistry, operate the equipment, and clean your pool.


How Long Does It Take to Build a Pool in LA?

Typical timeline: 8 to 12 weeks, not including the permitting phase. Projects with complex engineering, luxury features, or difficult access can take longer.


Final Thoughts

Building a pool in Los Angeles is an investment in lifestyle and property value. With the city’s year-round sunshine, it’s no wonder so many homeowners are diving into pool construction. Just be sure to work with a licensed, experienced contractor who understands LA’s zoning laws and terrain challenges. With the right team, your backyard can become the ultimate staycation destination.